Since we didn't have anything up before now - the Part 2 in this post refers to the fact that Max and I are going to be attacking the 100A service out the barn again tonight... the first night, we pulled all the scummy wires and rats nest left behind out of the existing conduit - then we reused the conduit between the house and the barn, ran conduit up into the garage attic, and a 10' run along the outside of the attic...
Tonights plan is to complete the attic run, come back down on the other side of the garage, punch through into the basement and get to the main service panel... We shall see...
Tonights plan is to complete the attic run, come back down on the other side of the garage, punch through into the basement and get to the main service panel... We shall see...